CONTECH-CA PROJECTS
VIEW ALL OUR PROJECTS BELOW
How to meet the Skilled Nursing Facility Emergency Power Requirements AB 2511 - 96 hours
Wondering how to meet the recently adopted AB-2511 Skilled nursing facilities backup power requirements?This presentation was developed to provide a how-to guide and some specific
HACi (OSHPD) HBSB Energy & Environment Committee Publish the Final Microgrid White Paper 🔋☀️⚡︎
On January 21 the HACi (HBSB) Energy & Environment Committee voted to accept the White Paper following a presentation by the team assembled to produce
When the Electric Grid is No Longer Enough: Microgrids as Reliability Heroes
Hope you can join us – 8 am Pacific/11 am Eastern, May 11th, 2021 to hear how the San Benito Community Clinic, a net-zero facility
Kaiser Ontario, Sustainable Microgrid Hospital
CONTECH-CA Role: Electrical Engineer – Microgrid Consulting Project Description: The project, which includes 2.2 megawatts (MW) of solar, a 1 MW fuel cell from Bloom
OSHPD HBSB Energy & Environment Committee Vote to Accept Microgrid White Paper, January 21st, 2021 ✅
On January 21 the HBSB Energy & Environment Committee voted to accept the White Paper following a presentation by the team assembled to produce this
OSHPD HBSB Microgrid Presentation, December 10th, 2020
As part of the HBSB Microgrid White Paper development, I gave an update to the HBSB Board at the December 12th, 2020 virtual meeting.
Keeping the Lights On: The Need to Know on Back-Up Power Solutions
Why Consider a Back-up Power Solution? A home generator, battery, or solar battery back-up is becoming more of an essential household resource than an option.
San Benito Health Foundation – Hollister, CA
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is a small (17,584 square foot) critical health care facility serving
5 ways to prepare for planned power outages
With PG&E planned power outages seemingly imminent, it is crucial for business owners and building owners to be prepared with a power shutoff management plan.
Kaiser Permanente, Richmond CA Microgrid
Project description: Design and install a renewable microgrid consisting of 250kW solar PV structures utilizing SunPower modules (on top of the existing parking garage)