Project Team
Owner: Hartstone
Electrical Engineer: CONTECH-CA
Architect: Foust Architecture, Inc
Bible Camp Chapel Building Renovation
Comprehensive electrical engineering, load optimization, and Title 24 energy compliance services for the new lobby extension and chapel addition at the Hartstone Bible Camp in Potter Valley, CA. Our team engineered a high-resolution electrical framework designed to support the multi-functional requirements of the new A-3 occupancy assembly space while guaranteeing seamless infrastructure continuity from the campus's existing assets.
Have a complex project in mind?
Whether you’re planning a new facility, upgrading emergency power, or exploring a microgrid, let’s talk through your goals and find the right path forward. Feel free to get in touch with us here.