MarinHealth, Greenbrae, CA – Generator Controls Replacement Project

Existing refurbished generator and a new digital controls

Project description

Due to the failure of the existing generator controls, CONTECH-CA led the design and construction administration. To support the hospital during the construction work, CONTECH-CA also oversaw the installation and testing of a temporary generator.
The temporary generator was installed in accordance with OSHPD CAN 2-108

New digital controls installed in existing switchgear


Markets: Healthcare, Mission Critical

Size: (2) 750kW Standby generators, (1) 2000 kW Temporary Generator

Delivery: Owner Builder

Features: Electrical Engineering, Emergency power coordination, NFPA 110 testing, project administration, temporary emergency power.

Resilience: Design and Construction executed during PG&E Outages and while supporting an operational critical care hospital

Project Team: CONTECH-CA, MCE Architect, EStructure Structural Engineers, Cummins


Extensive temporary feeder installation

Previous
Previous

Residence, Goodhill Rd, Kentfield, CA – Electrical Distribution, Utility & Tesla Coordination

Next
Next

Residence, Laurel Grove, Kentfield, CA – Electrical Distribution & Utility Coordination