Project description
Due to the failure of the existing generator controls, CONTECH-CA led the design and construction administration. To support the hospital during the construction work, CONTECH-CA also oversaw the installation and testing of a temporary generator.
The temporary generator was installed in accordance with OSHPD CAN 2-108
New digital controls installed in existing switchgear
Markets: Healthcare, Mission Critical
Size: (2) 750kW Standby generators, (1) 2000 kW Temporary Generator
Delivery: Owner Builder
Features: Electrical Engineering, Emergency power coordination, NFPA 110 testing, project administration, temporary emergency power.
Resilience: Design and Construction executed during PG&E Outages and while supporting an operational critical care hospital
Project Team: CONTECH-CA, MCE Architect, EStructure Structural Engineers, Cummins
Extensive temporary feeder installation