When the Electric Grid is No Longer Enough: Microgrids as Reliability Heroes
Hope you can join us – 8 am Pacific/11 am Eastern, May 11th, 2021 to hear how the San Benito Community Clinic, a net-zero facility
Kaiser Ontario, Sustainable Microgrid Hospital
CONTECH-CA Role: Electrical Engineer – Microgrid Consulting Project Description: The project, which includes 2.2 megawatts (MW) of solar, a 1 MW fuel cell from Bloom
San Benito Health Foundation – Hollister, CA
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is a small (17,584 square foot) critical health care facility serving
UC Davis Medical Center Surgery and Emergency Pavilion, Sacramento, CA
Role: Electrical Engineer and Project Manager Project Description The project opened in 2011—comprised of a 4-story, 471,000-sq-ft surgery and emergency pavilion The new building
Laguna Honda Hospital, San Francisco, CA Redevelopment
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.* My involvement started at Schematic Design and I led the
John Muir Health, Walnut Creek, CA – Generator Replacement
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Led project from concept and budgeting through construction and commissioning.
MarinHealth, Greenbrae, CA – Nurse Call System Upgrade Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Project Description: Upgrade of the existing analog nurse call system. The upgrade was
MarinHealth, Greenbrae, CA – Generator Controls Replacement Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. As a project was undertaken as an OSHPD emergency project we also led
MarinHealth, Greenbrae, CA – Virtual Patient Care Project
Role: To support the installation of a virtual patient care system we provided electrical infrastructure design and construction administration support, from concept through project completion.
New Stanford Hospital, Palo Alto, CA
Role: As the electrical engineer (EEOR) for the new Stanford Hospital, instrumental in the design and construction of the normal and emergency power systems.*During the
Marin Health Oak Pavillion Hospital, Greenbrae, CA
Role: As the electrical engineer (EEOR) for the new MarinHealth Hospital, led the design of the normal and emergency power systems.*During the design worked closely
Stanford University Hospital Command Center, Palo Alto, CA
Project Description: To meet the seismic compliance it was necessary to move the compact security and command center, and all its systems and operations to
Kaiser Permanente, San Leandro, CA
Delivered on a Budget and Two Months Ahead of Schedule. Principal in Charge for the MEP Design (John Was employed by Mazzetti while working on