How to meet the Skilled Nursing Facility Emergency Power Requirements AB 2511 - 96 hours
Wondering how to meet the recently adopted AB-2511 Skilled nursing facilities backup power requirements?This presentation was developed to provide a how-to guide and some specific
22 intriguing microgrid projects to watch in 2022 - Kaiser, Ontario
Good to see this list of projects highlighting their innovation, ability to serve as models, and demonstration of microgrid benefits. Also great to have the Kaiser
Medical Office Building Sustainable System Features
Great to see that sustainable building systems are being viewed as features on medical office buildings. Great to see that solar power, EV charging etc.
Kaiser Ontario, Sustainable Microgrid Hospital
CONTECH-CA Role: Electrical Engineer – Microgrid Consulting Project Description: The project, which includes 2.2 megawatts (MW) of solar, a 1 MW fuel cell from Bloom
San Benito Health Foundation – Hollister, CA
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is a small (17,584 square foot) critical health care facility serving
Laguna Honda Hospital, San Francisco, CA Redevelopment
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.* My involvement started at Schematic Design and I led the
New Stanford Hospital, Palo Alto, CA
Role: As the electrical engineer (EEOR) for the new Stanford Hospital, instrumental in the design and construction of the normal and emergency power systems.*During the
Ford Research and Innovation Center, Palo Alto
Project Description: Assisted in the design of the electrical systems for this unique project in the heart of Silicon Valley for Ford.* As a longtime
Pond Farm Brewing Co., San Rafael CA
Project description: Electrical engineering service for Pond Farm Brewing Co. Project Type Building Conversion Features Micro Brewery, Dining Area & Bar Sustainability Adaptive re-use, low
Kaiser Permanente, San Leandro, CA
Delivered on a Budget and Two Months Ahead of Schedule. Principal in Charge for the MEP Design (John Was employed by Mazzetti while working on