Laguna Honda Hospital, San Francisco, CA Redevelopment

Role

Electrical engineer and MEP design project manager for the extensive renovation and replacement project.* My involvement started at Schematic Design and I led the MEP Design through to project commissioning.

Laguna Honda Hospital Redevelopment is unique in many ways; it was the first LEED Silver hospital in California, the design reduced energy usage by the use of evaporative cooling and has operable windows


Markets: Healthcare, Mission Critical

Size: (3) 2000kVA Hetch Hetchy Service, (2) 1000kW Standby Generators, (2) 2000 kW Temporary Generators, Site Distribution & Power

Delivery: Design-Bid Build

Features: OSHPD, LEED SilverResilienceI-Occupancy

Project Team: San Francisco Public Works Department, Arup (employed by at the time of the project), Rosendin Electric, Rutherford & Chekene & Forell/Elsesser Structural Engineers, Caterpillar, ASCO power systems


*Was involved on the project while employed as Associate at Arup