Marin Health Oak Pavillion Hospital, Greenbrae, CA

Role

As the electrical engineer (EEOR) for the new MarinHealth Hospital, led the design of the normal and emergency power systems.*
During the design worked closely with the design-build and facility team to ensure the project goals were met.


Markets: Hospital I-Occupancy 

Size: 254,000 sq ft, $534m

Features: Design Build, BIM/VDC Delivery, ED, ICU, 114 private rooms

Sustainability: LEED Silver

Project Team: McCarthy Construction, Perkins Eastman, KPFF, Morrow Meadows, Mazzetti, Pan Pacific



*Was involved on the project while employed as Principal by Mazzetti