Marin Health Oak Pavillion Hospital, Greenbrae, CA
Role
As the electrical engineer (EEOR) for the new MarinHealth Hospital, led the design of the normal and emergency power systems.*
During the design worked closely with the design-build and facility team to ensure the project goals were met.
Markets: Hospital I-Occupancy
Size: 254,000 sq ft, $534m
Features: Design Build, BIM/VDC Delivery, ED, ICU, 114 private rooms
Sustainability: LEED Silver
Project Team: McCarthy Construction, Perkins Eastman, KPFF, Morrow Meadows, Mazzetti, Pan Pacific
*Was involved on the project while employed as Principal by Mazzetti