22 intriguing microgrid projects to watch in 2022 - Kaiser, Ontario
Good to see this list of projects highlighting their innovation, ability to serve as models, and demonstration of microgrid benefits. Also great to have the Kaiser
HACi (OSHPD) HBSB Energy & Environment Committee Publish the Final Microgrid White Paper 🔋☀️⚡︎
On January 21 the HACi (HBSB) Energy & Environment Committee voted to accept the White Paper following a presentation by the team assembled to produce
Hospitals joining in the decarbonization movement?
Hospitals joining in the decarbonization movement? Anyone involved in hospital design or operation will be thinking – wow …mammoth task, particularly with the ongoing challenges
Medical Office Building Sustainable System Features
Great to see that sustainable building systems are being viewed as features on medical office buildings. Great to see that solar power, EV charging etc.
When the Electric Grid is No Longer Enough: Microgrids as Reliability Heroes
Hope you can join us – 8 am Pacific/11 am Eastern, May 11th, 2021 to hear how the San Benito Community Clinic, a net-zero facility
Kaiser Ontario, Sustainable Microgrid Hospital
CONTECH-CA Role: Electrical Engineer – Microgrid Consulting Project Description: The project, which includes 2.2 megawatts (MW) of solar, a 1 MW fuel cell from Bloom
OSHPD HBSB Energy & Environment Committee Vote to Accept Microgrid White Paper, January 21st, 2021 ✅
On January 21 the HBSB Energy & Environment Committee voted to accept the White Paper following a presentation by the team assembled to produce this
OSHPD HBSB Microgrid Presentation, December 10th, 2020
As part of the HBSB Microgrid White Paper development, I gave an update to the HBSB Board at the December 12th, 2020 virtual meeting.
San Benito Health Foundation – Hollister, CA
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is a small (17,584 square foot) critical health care facility serving
Laguna Honda Hospital, San Francisco, CA Redevelopment
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.* My involvement started at Schematic Design and I led the
Residence, Laurel Grove, Kentfield, CA – Electrical Distribution & Utility Coordination
Role: We collaborated with the site owner to develop cost-effective electrical distribution solutions. Project description: Consultation and assistance in the preparation of technical information required for
HoloBuilder Construction Technology Collaboration, San Francisco, CA
Role: Consulted with HoloBuilder to help them develop their platform into an effective information gathering and reference solution. Acted as bridge between practical application and
2000 Marin St Redevelopment, San Francisco, CA, Redevelopment Masterplan
Collaborated with site owner to develop electrical distribution solutions.
New Stanford Hospital, Palo Alto, CA
Role: As the electrical engineer (EEOR) for the new Stanford Hospital, instrumental in the design and construction of the normal and emergency power systems.*During the
Marin Health Oak Pavillion Hospital, Greenbrae, CA
Role: As the electrical engineer (EEOR) for the new MarinHealth Hospital, led the design of the normal and emergency power systems.*During the design worked closely
Kaiser Permanente, Richmond CA Microgrid
Project description: Design and install a renewable microgrid consisting of 250kW solar PV structures utilizing SunPower modules (on top of the existing parking garage)
Kaiser Permanente, San Leandro, CA
Delivered on a Budget and Two Months Ahead of Schedule. Principal in Charge for the MEP Design (John Was employed by Mazzetti while working on