Laguna Honda Hospital, San Francisco, CA Redevelopment
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.* My involvement started at Schematic Design and I led the
![](https://www.contech-ca.com/wp-content/uploads/2020/04/John-Muir-hero-300x150.png)
John Muir Health, Walnut Creek, CA – Generator Replacement
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Led project from concept and budgeting through construction and commissioning. Oversaw the design,
![](https://www.contech-ca.com/wp-content/uploads/2019/01/Ford_featured-1-300x150.png)
Ford Research and Innovation Center, Palo Alto
Project Description: Assisted in the design of the electrical systems for this unique project in the heart of Silicon Valley for Ford.* As a longtime
![Kaiser Richmond, CA microgrid project](https://www.contech-ca.com/wp-content/uploads/2018/12/Contech_Project_Kaiser_featured-300x150.jpg)
Kaiser Permanente, Richmond CA Microgrid
Project description: Design and install a renewable microgrid consisting of 250kW solar PV structures utilizing SunPower modules (on top of the existing parking garage), 1
![](https://www.contech-ca.com/wp-content/uploads/2018/12/Kaiser-Hospital-Support-Building_featured-300x150.jpg)
Kaiser Permanente, San Leandro, CA
Delivered on a Budget and Two Months Ahead of Schedule. Principal in Charge for the MEP Design (John Was employed by Mazzetti while working on
![](https://www.contech-ca.com/wp-content/uploads/2020/05/Screen-Shot-2020-05-25-at-1.50.25-PM-300x118.png)
Laguna Honda Hospital, San Francisco, CA Redevelopment
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.*
![](https://www.contech-ca.com/wp-content/uploads/2020/04/John-Muir-hero-300x150.png)
John Muir Health, Walnut Creek, CA – Generator Replacement
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Led project from
![](https://www.contech-ca.com/wp-content/uploads/2019/01/Ford_featured-1-300x150.png)
Ford Research and Innovation Center, Palo Alto
Project Description: Assisted in the design of the electrical systems for this unique project in
![Kaiser Richmond, CA microgrid project](https://www.contech-ca.com/wp-content/uploads/2018/12/Contech_Project_Kaiser_featured-300x150.jpg)
Kaiser Permanente, Richmond CA Microgrid
Project description: Design and install a renewable microgrid consisting of 250kW solar PV structures utilizing
![](https://www.contech-ca.com/wp-content/uploads/2018/12/Kaiser-Hospital-Support-Building_featured-300x150.jpg)
Kaiser Permanente, San Leandro, CA
Delivered on a Budget and Two Months Ahead of Schedule. Principal in Charge for the