CONTECH-CA PROJECTS
VIEW ALL OUR PROJECTS BELOW
Sonoma Valley Hospital CT Replacement
Repurpose existing vacant OR space into a CT scanner suite. Modify the existing electrical systems to support the new scanner well the existing one is still in operation.
How to meet the Skilled Nursing Facility Emergency Power Requirements AB 2511 - 96 hours
Wondering how to meet the recently adopted AB-2511 Skilled nursing facilities backup power requirements?This presentation was developed to provide a how-to guide and some specific
Jam Foods Facility, San Rafael CA
The Challenge – Convert an existing storage building into a food production facility utilizing existing utility capacities Project Goals Design electrical systems to support the
Google, Palo Alto – Commissioning
The Challenge – Increase the main electrical service without interruption to regular business operation, and complete it on schedule on budget, and in compliance with
HACi (OSHPD) HBSB Energy & Environment Committee Publish the Final Microgrid White Paper 🔋☀️⚡︎
On January 21 the HACi (HBSB) Energy & Environment Committee voted to accept the White Paper following a presentation by the team assembled to produce
Medical Office Building Sustainable System Features
Great to see that sustainable building systems are being viewed as features on medical office buildings. Great to see that solar power, EV charging etc.
Kaiser Ontario, Sustainable Microgrid Hospital
CONTECH-CA Role: Electrical Engineer – Microgrid Consulting Project Description: The project, which includes 2.2 megawatts (MW) of solar, a 1 MW fuel cell from Bloom
OSHPD HBSB Energy & Environment Committee Vote to Accept Microgrid White Paper, January 21st, 2021 ✅
On January 21 the HBSB Energy & Environment Committee voted to accept the White Paper following a presentation by the team assembled to produce this
OSHPD HBSB Microgrid Presentation, December 10th, 2020
As part of the HBSB Microgrid White Paper development, I gave an update to the HBSB Board at the December 12th, 2020 virtual meeting.
San Benito Health Foundation – Hollister, CA
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is a small (17,584 square foot) critical health care facility serving
580 Irwin St, Office Re-Development San Rafael, CA
CONTECH-CA Role: Electrical Engineer of Record Project Description: Remodel of existing office and warehouse to accommodate the new tenant, Russell Hinton Co. Painting and Drywall Contractor Design
UC Davis Medical Center Surgery and Emergency Pavilion, Sacramento, CA
Role: Electrical Engineer and Project Manager Project Description The project opened in 2011—comprised of a 4-story, 471,000-sq-ft surgery and emergency pavilion The new building
Morrison Road, Ross Electrical Design
Design of a 4200 sqft private residence with a 796 sqft ADU.
The client wished for a contemporary design that features curves and ample glass to maximize views towards Mount Tamalpais in Marin County.
Bond Lane Tiburon, CA – Electrical Distribution, Utility & Coordination
Role: We collaborated with the site owner to develop load calculations necessary for the PG&E application and service sizing. Project description: Consultation and assistance in the
Laguna Honda Hospital, San Francisco, CA Redevelopment
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.* My involvement started at Schematic Design and I led the
Remote critical infrastructure emergency power technical support – Multinational locations
Roll: Provided technical support troubleshooting and design assistance for critical infrastructure systems located in various remote locations around the world. Project description: The project replaced
John Muir Health, Walnut Creek, CA – Generator Replacement
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Led project from concept and budgeting through construction and commissioning.
MarinHealth, Greenbrae, CA – Nurse Call System Upgrade Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Project Description: Upgrade of the existing analog nurse call system. The upgrade was
Residence, Goodhill Rd, Kentfield, CA – Electrical Distribution, Utility & Tesla Coordination
Role: We collaborated with the site owner to develop cost-effective electrical distribution solutions, Extensive Coordination with Tesla to ensure the power walls were completely integrated.
MarinHealth, Greenbrae, CA – Generator Controls Replacement Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. As a project was undertaken as an OSHPD emergency project we also led