
San Benito Health Foundation – Hollister, CA
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is a small (17,584 square foot) critical health care facility serving
CONTECH-CA Role: Consulting Electrical Engineer – Microgrid Project Description: San Benito Health Foundation (SBHF) is a small (17,584 square foot) critical health care facility serving
CONTECH-CA Role: Electrical Engineer of Record Project Description: Remodel of existing office and warehouse to accommodate the new tenant, Russell Hinton Co. Painting and Drywall Contractor Design
Role: Electrical Engineer and Project Manager Project Description The project opened in 2011—comprised of a 4-story, 471,000-sq-ft surgery and emergency pavilion The new building
Role: We collaborated with the site owner to develop load calculations necessary for the PG&E application and service sizing. Project description: Consultation and assistance in the
Role: Electrical engineer and MEP design project manager for the extensive renovation and replacement project.* My involvement started at Schematic Design and I led the
Roll: Provided technical support troubleshooting and design assistance for critical infrastructure systems located in various remote locations around the world. Project description: The project replaced
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Led project from concept and budgeting through construction and commissioning. Oversaw the design,
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. Project Description: Upgrade of the existing analog nurse call system. The upgrade was
Role: We collaborated with the site owner to develop cost-effective electrical distribution solutions, Extensive Coordination with Tesla to ensure the power walls were completely integrated. Project
Role: Electrical engineer and ‘design professional in responsible charge’ for the project. As a project was undertaken as an OSHPD emergency project we also led
On January 21 the HBSB Energy & Environment Committee voted to accept the White Paper following a presentation by the team assembled to produce this
Copyright 2021 – Designed and built by Simplify-IT.uk